How Parameters Affecting The Performance Of A Shale Shaker

How Parameters Affecting The Performance Of A Shale Shaker: The performance of a shale shaker depends on the large number of parameters. The most important variables affecting the capacity of a shale shaker are drilling fluid rheological properties, concentration and size distribution of solids, screen mesh and area, vibration frequency, vibration pattern, acceleration, and deck angle. Shale Shakers Are Most Important Device In Solids …

Thursday, November 15, 2018

Oil Muds And Its Troubleshooting

An oil base fluid can be defined as a drilling fluid which has oil as its continuous or external phase and the water, if present, is the dispersed or internal phase. The solids in an oil base fluid are oil wet, all additives are oil dispersible and the filtrate of the mud is oil. The water, if present, is emulsified in the oil phase.




Oil Muds And Its Troubleshooting

Tuesday, November 13, 2018

Decanter Centrifuge And Energy Materials Production

The production of raw materials for energy generation – coal, oil, and gas offers considerable scope for the use of decanter centrifuges, at least for coal and oil. The manufacture of gas is a little-used process now that natural gas is so freely available. When this phase passes, as gas availability reduces, then the gasification of coals and heavy oils will also offer good applications (as will the eventual need to convert coals into liquid fuels).

Decanter Centrifuge And Energy Materials Production
decanting centrifuge

Tuesday, August 28, 2018

Drilling waste recycling System Working



The process of drilling oil and gas wells generates large volumes of drill cuttings and used muds. Onshore and offshore operators have employed a variety of methods for managing these drilling wastes. In offshore, options are limited to cuttings reinjection, offshore discharge and transportation to onshore disposal facility. This is as a result of the limited space and stringent environmental regulations governing an offshore drilling operation. As a result some offshore wastes have to be transported to an onshore facility for treatment and disposal. Onshore operations however, have a wider waste management options. The selection of a disposal method for a particular location depends on other factors which must be evaluated extensively before implementation. The main aim should be towards ensuring an environmentally safe waste disposal approaches.

The solids control system forms the first waste management practice in any drilling operation. It removes drill cuttings from the drilling mud at the surface just before the mud re-enters the mud-pit for recirculation. Apart from drill cuttings, the solids control equipment also removes some gases and other contaminants in the mud before they are re-circulated. The early removal of these solids avoids accumulation and clogging of the system and the separation devices sizes of solids. The components of the solids control system will depend upon the types of drilling fluid used, these formations being drilled, the available equipment on the rig, and the specific requirements of the disposal option. But basically, standard solid control equipment will comprise of shale shakers, degassers, desanders and desilters. The mud passes over a shale shaker, which is basically a vibrating screen. This removes the larger particles, while allowing the residue to pass into settling tanks. The finer particles are further removed in the desanders and desilters. If the mud contains gas from the formation it will be passed through a degasser which separates the gas from liquid mud.

Cutting reinjection is common to both offshore and onshore operations. However, due to the availability of space for an onshore operation, there are a lot more management options available. The most common onshore disposal method is perhaps onsite burial. Other methods include the construction of a waste reserve pit, thermal methods like incineration, kilns, open burning etc. There are also biological methods like composting, land-spreading, land-farming etc. In an onshore environment, waste can be treated and used for other beneficial applications like road spreading, construction materials etc. This section explores the various options available for onshore waste treatment and disposal.

Monday, July 30, 2018

Tips For Solids Control Of Drilling

Tips For Solids Control Of Drilling: The rule of solids control is always the same: Success to any method of solids control is achieved when cuttings are kept intact from bit to surface.

Friday, July 6, 2018

The purpose of using mud gas separator


The main purpose of a mud gas separator is to vent the gas and save the drilling fluid. This is important not only economic reasons, but also to minimise the risk of circulating out a gas kick without having to shut down to mix additional mud volume.
In some situations the amount of mud lost can be critical when surface volume is marginal and on-site mud supplies are limited. When a gas kick is properly shut in and circulated out, the mud gas separator should be capable of saving most of the mud.


The atmospheric type separator operates on the gravity or hydrostatic pressure principle.
The essential design features are:
  • Height and diameter of separator
  • Internal baffle arrangement to assist in additional gas break-out
  • Diameter and length of gas outlet
  • A target plate to minimise erosion where inlet mud gas mixture contacts the internal wall of the separator, which provides a method of inspecting plate wear
  • A U-tube arrangement properly sized to maintain fluid head in the separator.


Features of AIPU Mud Gas Separator

  • 1.H2S resistant material for longer life.
  • 2.Large flow rate.
  • 3.Efficient degassing performance.
  • 4.Mud seal design for clean mud flow out.
  • 5.Pressure vessel certification available.
  • 6.Customization on vessel diameter.
  • 7.Support leg with elevation or not.
  • 8.Common steel at economical cost is for option.
  • 9.Heavy anticorrosive painting both internal appearance and external.

How To Choose a Mud Gas Separator?

  • 1.Drilling mud system flow rate
  • 2.Confirm do you need H2S resistant or not
  • 3.Any customization on mud gas separator


    tony@aipusolidcontrol.com
    What's app: +86-189 91340733

Tuesday, July 3, 2018

Introduction of Aipu mud tank valve

mud tank valve or mud pit dump valve is used in suction manifold of mudtank to control the inflow and outflow of mud. Features: Verne seal Size: 6"、8"、10"、12"、14"、16" or as per customer's requirement. Operation:
Rotating the valve handwheel to make valve rod move up and down by which the valve plate is lifted up,separating the valve plate and clutch of sealing socket,opening the valve body.




Mud tank valve are made up of following parts:
Outer Pipe
Connecting rod
Connecting pipe
Screw rod

We manufacture mud tank valve for many years ,pls contact us for more information;
tony@aipusolidcontrol.com
what's app: +86-189 9134 0733

Tuesday, June 26, 2018

Mobile Oil Sludge Treatment System


Mobil Oil Sludge Treatment System 

Technology Introduction:
Self-feeding function: With the design of self-feeding equipment,it will transport oil-sludge liquids and solids to the first mobile processing tank,satisfying excessive oil-sludge feeding.

There have the filter screen design at the entrance of self-feeding equipment,
this will avoid other big materials entering into the system.

Pretreatment:
oil sludge will be separated into smaller solids under the work of rotating blades and 
sieve plate.Those are bigger than 20 mm solids are transported to one side of 
collective tank by rotating blades,smaller than 20 mm solids will be pumped to
oil pretreatment tank under the work of sieve plate.

liquefied and Separation
 oil-sludge can be liquefied,purified under the work of chemistry,ultrasound,air flotation,agitation.Thus the crude oil would be separated out.

Fine separation
Sperating the oil-sludge with three-phase high speed frequency centrifuge.

Water and oil separation
Water will be pumped into water tank and oil to oil tank through high speed centrifuge from which the hot water can be returned to use.


For more information and price,pls talk to me via email or what's app.

Email: tony@aipusolidcontrol.com
what's app: +86-189 9134 0733

Friday, June 22, 2018

Replacing your shale shaker screen when you find following phenomenon happened

Replacing your shale shaker screen 
when you find following phenomenon happened


Shale shaker screen is wearing parts in drilling solids separation process,since long time working will make it getting weary little by little.

Shale shaker screen can keep working 7 days,or even 15 days,while in some cases it can only lasted 3 days because it depends on mud property,and whether user have a proper usage or not.


Too much build up of the unwanted solids on the screen panel will cause loss of drilling fluid,and low working separation efficiency of shale shaker.

In above video,there are too much unwanted drilling solids build up on the screening layer,under such circumstance,user should replace it with new screens,or washing the screen when shale shaker stop running.

Aipu Solids Control manufacture shale shaker screen for many years,we provide replacement screen for Derrick,NOV Brandt,Sweco,etc. Customer provide us the screen size,screening layer type,frame material ,then we can make it for you accordingly.

tony@aipusolidcontrol.com
what's app: +86-189 9134 0733


Friday, May 4, 2018

Eight general rules to assure shale shakers will work properly and remove cuttings



1. The shale shaker should be run continuously while circulating. Cuttings cannot be separated if the shaker bed is not in motion.

2. Fluid should cover most of the screen. If only one quarter or one third of the screen is covered, the screen is too coarse and should be replaced with a finer screen.

3. If fluid flows through a hole or tear, cuttings are not removed. Any screen with a hole or tear should be replaced immediately. With a panel screen, the hole or tear can be plugged.

4. Shaker screen replacements should be made as quickly as possible. Minimize downtime by planning your work. Locate and arrange tools and screens before starting. If possible, get help. This will decrease the amount of cuttings being kept in the mud because the shaker is not running. If possible, change screens during a connection. In critical situations, drilling may be interrupted and the pumps stopped while the screen is replaced.

5. Dilution fluid (water or oil) should not be added in the possum belly or on the shaker screen. Dilution fluid should be added downstream. Dilution-fluid (even water) additions should be metered or otherwise measured.

6. Except for cases of lost circulation (when it is necessary to retain lost circulation material), the shaker should not be bypassed, not even for a short time.

7. Large cuttings should be removed from the possum belly when mud is not being circulated. If the possum belly is dumped into the sand trap just before making a bit or wiper trip, the sand trap should also be cleaned. Otherwise, when fluid circulation starts after a trip, the large cuttings dumped into the sand trap will likely move down the pit system and plug desilters or desanders. Note: The possum belly and/ or sand trap is not always used with synthetic-based mud or some specialized fluid systems.

8. As much as possible, flow from the well (bell nipple) should be evenly distributed
among all the shakers.


More information about shale shaker and screen ,
email me: tony@aipusolidcontrol.com




Friday, April 27, 2018

Aipu screw conveyor


Screw conveyors in modern industry are often used horizontally or at a slight incline as an efficient way to move semi-solid materials, including food waste, wood chips, aggregates, cereal grains, animal feed, boiler ash, meat and bone meal, municipal solid waste, and many others

Aipu Drilling Cuttings Screw Conveyor

Screw conveyor is designed to delivery drilling cuttings and feed to vertical cuttings dryer or High G drying shaker for further treatment. Usually, the screw diameter has 4 options :

10 inch, 
12inch,
 16 inch, 
20 inch;

Screw length is customer built too, but commonly there are 12~48 feet
Furthermore,depends on clients’demand the screw conveyor will be made of different materials. Including carbon steel, stainless steel graded differently.


Features ofAIPU Screw Conveyor


1.Compact design with small foot print.
2.Tightseal.
3.Stable and reliable performance.
4.Flexible design on input and output port.
5.Easy to operate and maintain.
6.Gear box and motor are top brand with high quality.
7.Custom built available per actual requirement.

Screw Conveyor Technical Parameters

ModelScrew Conveyor Dia.(mm)Conveyor Length (mm)Capacity (t/h)Power(KW)Speed(rpm)
APLS250250Custom Design207.560
APLS2003002511
APLS4004003011
APLS5005005015

more questions,pls contact me:
tony@aipusolidcontrol.com

Aipu mud cleaner application description


Aipu mud cleaner utilize a two-stage separation process for enhanced drilling fluid recovery. The design enables our mud cleaners to handle the entire circulating volume and remove and dry solids while retaining premium base fluid, which is vital to drilling success.


Our two-stage process is achieved by a combination of hydrocyclones mounted over a shale shaker to operate as a single unit. The hydrocyclones make the primary separation with underflow directed onto the shaker vibrating screen.
Effective for weighted and unweighted fluids


Aipu mud cleaners are equally effective for both weighted and unweighted drilling fluids and effectively lower both drilling fluid expenses and disposal costs.

Mud Cleaner Technical Parameters

ModelHunter 50Hunter 90Hunter 120Hunter 200Hunter 240Hunter 320
Capacity50m³/h90m³/h120m³/h200m³/h240m³/h320m³/h
Desander Size8 inch10 inch
Desander Qty1 Pcs2 Pcs3 Pcs
Desilter Size4 inch
Desilter Qty4 Pcs6 Pcs8 Pcs10 Pcs12 Pcs16 Pcs
Work Pressure0.25~0.45  MPa
Separate Point15μm~74μm
Bottom ShakerModelHunter MiniHunter D3Hunter MG4
Vibration ModeLinear Motion
Vibrator Motor2×0.75Kw2×1.72Kw2×1.72Kw
G Force≤7.5G
Deck Angle-1 - +5°
Screen Area1.35㎡2.27㎡2.73㎡
Screen Panel2 Pcs3 Pcs4 Pcs
Dimension (mm)1650×1250×17501650×1250×19001650×1250×19002455×1850×22502455×1850×22502850×1800×2250
Weight(Kg)110016001650210021502350
Remark4" cone =12~15m³/h, 8"cone=30~35m³/h,10"cone=90~120m³/h. It can be configured according to clients' demand

Friday, April 20, 2018

How many equipment shall be needed for mud recycling system in oil drilling project

Mud recycling is very important in well drilling activities since the mud consists of precious chemical substance,therefore the reasonable configuration of mud recycling system is worth careful thinking.

The mud cleaning system has the function of mud recycling and mud mixing of drilling mud.This system consists of different solids processing equipment which are;
  1. Shale shaker
  2. mud cleaner
  3. vacuum degasser
  4. centrifugal pump
  5. mixing pump and mixing hopper
  6. mud agitator
  7. electric control system
  8. other accessories which used to connect pipelines,valves etc
  9. mud tank
These equipment are mounted on the top of mud tank which is divided into different compartments where the mud fluid will be stored and precipitated to be processed by the next processing equipment.
The quantities of each equipment is up to customer's requirement on their processing capacity. Deeper well drilling will require more shale shakers,bigger tank size...
For detailed information,pls contact: tony@aipusolidcontrol.com

Tuesday, April 17, 2018

Aipu Solids Control Manufactures different type of mud tank


Mud tank manufactured by Aipu Solids Control

Mud tank is an open-top container used to store drilling fluid on a drilling rig,made of square steel tube and plate.

mud tank overview

The main structure of a mud tank

Body
The body of the tank is made by welding the steel plate and section, using the smooth cone-shape structure or the corrugated structure. 

Ladder

Made of channel steel ,slip-resistant .                                                                                                     mud tank ladder                                               mud tank ladder details


Compartment

A tank is sectioned off into different compartments. A compartment may include a settling tank, sometimes called a sand trap, to allow sand and other solids in the drilling fluid to precipitate before it flows into the next compartment.


Other compartments may have agitators on the top, which have long impellers below inserting into the tank and stirring the fluids to prevent its contents from precipitating. And mud guns are often equipped at the corners of the tanks' top, spraying high-pressed mud to prevent the drilling fluids in the corner of the compartment from precipitating, typically for the square tanks.


Guard rail

The two-sided guard rails are installed the safe suspension hook       
                      mud tank guard rail                                              mud tank guard rails


Walkway
made of slip resistant steel plate and expanded steel plate

mud tank walkway

The following solids control equipment will be mounted on the top of mud tank,they are:

shale shaker
vacuum degasser
desander
desilter
centrifuge
mud agitator
vertical slurry pump

Shaanxi Aipu Solids Control Equipment Co.,Ltd manufacture mud tank for many years,we can design and product it according to you requirement.Welcome your inquiry.

Please visit www.aipusolidcontrol.com for more information
or Email to: tony@aipusolidcontrol.com



Thursday, April 12, 2018

4 reasons are accounted for shale shaker screen getting premature damaged

How to avoid premature damage of your shaker screen ,you need to follow 4 points listed below.



1: Problem:

Tension strength of shale shaker screen mesh is inadequate: Screen mesh is rolled up for easy transportation and storage in many cases,this will cause pressure stress on mesh inside ,tensile stress outside,furthermore, long time use will loosen the screen mesh , lessen tension strength,leading to unexpected vibration,eventually screen mesh get broken off or partly sunken.

Solution: 

Enhance the tension strength of screen wire,keep screen surface leveled to reduce the pressure stress
2. Problem:

There are metal and non-metal material of it,including,low-carbon,high-carbon,high manganese steel,stainless steel etc,non-metal material including: rubber , nylon, polyurethane.If user choose not right material ,premature wear would happen.

Solution: 

User should choose corresponding screen material according to mud physical property,high manganese steel is a durable material.The embed knitting method of screen mesh gives screen surface balanced pressure,and cross over point without bump,it has better working performance and longer working time.

3.

Problem:

Feeding material has high stickiness.If feeding material has high humidity and viscid,it will tightly be attached to screen mesh, heaped up on the mesh surface,leading to screen mesh damage.

Solution:

Speed up the amplitude of shaker screen,and adjust shaker deck angle,or change mesh size to solve the problem.

4.

Problem:

Too much material feeding into shale shaker at one time.Too much feeding material beyond shaker screen's processing capacity will cause damage to the screen mesh.

Solution:

Successive and equally feeding to shaker screen is suggested,always avoid too much material feeding at one time. There can be added an surge hopper to lessen the impact force feeding material brings to screen mesh. With this method,the working life of screen mesh can be prolonged.

Shaanxi Aipu Solids Control Co.,Ltd manufacture shale shaker screen for many years,and has experienced engineer to make & design durable screen mesh as much as we can.

For more information,please visit www.aipusolidscontrol.com
Email: tony@aipusolidcontrol.com